Statement Furniture

Strata No. 01
Strata No. 01 is a hand-built wall relief in mineral composite, smoked oak and bronze. Irregular capsules rise at different depths across the surface, shifting from warm black to graphite as daylight moves through the room. A single bronze element interrupts the field.
Each relief is assembled and finished by hand. The layout is established in the studio, then individual elements are cast, placed and toned so the surface holds variation without becoming decorative noise.
Material and placement
The standard 900 × 900 mm work hangs from a concealed aluminium cleat. Larger and site-specific fields are divided into registered backing panels for transport and installation. Final tone, orientation and wall substrate are confirmed before production.
Configure a commission
Custom crating, insured freight and installation quoted to destination
10–14 weeks after finish approval and deposit
Signed record, approved drawings, operating guide and maintenance plan
Commission development, sculpture modules, selected studio finish, control enclosure, studio testing and signed handover dossier.
Site-specific structural engineering, custom crates, insured freight, taxes and duties, rigging, installation and final calibration.
Configuration and site review
The selected scale is the starting configuration. Final dimensions, structure, clearances, finish, movement and controls are confirmed against site drawings before fabrication.
Power and controls
Power location, switching, control integration and cable routes are shown in the approved project drawings.
Installation
Concealed wall cleat; final wall substrate, fixing points and orientation confirmed before production Structural capacity and local compliance remain subject to review by the project team.
Shipping and field assembly
Foam-lined art crate with removable face protection; insured freight quoted to destination. Freight is quoted after crate size, weight, destination, insurance and access are confirmed.
Service and replacement parts
Numbered modules and reversible connections are planned so drives, controls, lighting and optical components can be inspected or replaced individually. The final handover includes an operating guide and maintenance plan.



Strata No. 01 · technical outline
Standard commission envelope shown. Final dimensions, loads, fixings, power, service clearances, module breaks and crate sizes are issued after site review.


