Storage Cabinet

Petal Vault 03
Petal Vault 03 is an illuminated overhead composition of three blossom modules. Each module has five translucent petals around a serviceable low-voltage light core. The three scales overlap to create a sheltered luminous field for a courtyard, arrival space or hospitality room.
The imagery is a concept visualisation. Final suspension points, secondary structure, fire classification, electrical components, driver access, cleaning, wind exposure and local approvals must be engineered for the project before production.
Configure a commission
Custom crating, insured freight and installation quoted to destination
Indicative 20–30 weeks after engineering inputs and approvals are complete.
Signed record, approved drawings, operating guide and maintenance plan
Commission development, sculpture modules, selected studio finish, control enclosure, studio testing and signed handover dossier.
Site-specific structural engineering, custom crates, insured freight, taxes and duties, rigging, installation and final calibration.
Configuration and site review
The selected scale is the starting configuration. Final dimensions, structure, clearances, finish, movement and controls are confirmed against site drawings before fabrication.
Power and controls
Proposed low-voltage dimmable lighting with remote drivers; components and controls selected for the site. Power location, switching, control integration and cable routes are shown in the approved project drawings.
Installation
Structural survey, coordinated suspension drawing, fire and electrical approval, lifting plan and commissioning are mandatory. Structural capacity and local compliance remain subject to review by the project team.
Shipping and field assembly
Petal frames, skins, light cores and rigging travel as numbered modules; freight and lifting quoted to site. Freight is quoted after crate size, weight, destination, insurance and access are confirmed.
Service and replacement parts
Numbered modules and reversible connections are planned so drives, controls, lighting and optical components can be inspected or replaced individually. The final handover includes an operating guide and maintenance plan.





Petal Vault 03 · technical outline
Standard commission envelope shown. Final dimensions, loads, fixings, power, service clearances, module breaks and crate sizes are issued after site review.


