Statement Furniture

Interval 96
Interval 96 is a wall-mounted kinetic work composed of ninety-six independently driven dials. Each dial carries two black hands. Their rotations gather into lines, openings and slow fields before separating again.
The standard work is built as four serviceable drive cassettes behind a mineral-white face. Power and data connections are numbered, the wall rail is concealed, and individual motion modules can be removed without dismantling the complete work.
Movement
Studio-authored sequences move between ordered alignments and open compositions. Programme timing, quiet hours and building-control triggers are set during commissioning. The work can be configured for residential, hospitality, workplace and public interiors.
For architects and collectors
The listed studio configuration measures 1200 × 1800 mm. Wider fields and site-specific arrays are developed from wall elevations, viewing distance, access, power and control requirements. Final fabrication begins after approval of drawings, finishes and movement studies.
Configure a commission
Custom crating, insured freight and installation quoted to destination
16–22 weeks after design approval and deposit
Signed record, approved drawings, operating guide and maintenance plan
Commission development, sculpture modules, selected studio finish, control enclosure, studio testing and signed handover dossier.
Site-specific structural engineering, custom crates, insured freight, taxes and duties, rigging, installation and final calibration.
Numbered quick-connect power and data allow modules to be bench-tested and replaced individually.
Final crate sizes and installation sequence follow the approved access survey and packing drawing.
Configuration and site review
The selected scale is the starting configuration. Final dimensions, structure, clearances, finish, movement and controls are confirmed against site drawings before fabrication.
Power and controls
100–240 V AC isolated supply; concealed low-voltage distribution; local, scheduled or building-control trigger Power location, switching, control integration and cable routes are shown in the approved project drawings.
Installation
Wall-mounted on a levelled structural rail; substrate, service clearance, power and controls confirmed during site review Structural capacity and local compliance remain subject to review by the project team.
Shipping and field assembly
Numbered cassettes, face modules and concealed rail ship in reusable foam-lined crates. Final crate sizes and installation sequence follow the approved access survey and packing drawing. Freight is quoted after crate size, weight, destination, insurance and access are confirmed.
Service and replacement parts
Numbered modules and reversible connections are planned so drives, controls, lighting and optical components can be inspected or replaced individually. The final handover includes an operating guide and maintenance plan.



Interval 96 · technical outline
Standard commission envelope shown. Final dimensions, loads, fixings, power, service clearances, module breaks and crate sizes are issued after site review.
Specifications
Numbered quick-connect power and data allow modules to be bench-tested and replaced individually.
Final crate sizes and installation sequence follow the approved access survey and packing drawing.


