Statement Furniture

Fault Line No. 01
Fault Line No. 01 brings two dense mineral surfaces together around a cast-brass seam. The black planes are built in thin trowelled layers and finished to absorb light. The brass widens once, then returns to a narrow line.
The seam is not applied leaf. It is a separate metal component let into the surface, allowing its edge, thickness and patina to be controlled. A concealed aluminium subframe creates a quiet shadow gap around the work.
Made for the wall
The standard vertical format measures 1200 × 1800 mm. Larger works can follow a room’s proportion while retaining the same material logic. Wall construction, fixing positions and access are reviewed before the drawing is released for fabrication.
Configure a commission
Custom crating, insured freight and installation quoted to destination
12–16 weeks after drawing and finish approval
Signed record, approved drawings, operating guide and maintenance plan
Commission development, sculpture modules, selected studio finish, control enclosure, studio testing and signed handover dossier.
Site-specific structural engineering, custom crates, insured freight, taxes and duties, rigging, installation and final calibration.
Configuration and site review
The selected scale is the starting configuration. Final dimensions, structure, clearances, finish, movement and controls are confirmed against site drawings before fabrication.
Power and controls
Power location, switching, control integration and cable routes are shown in the approved project drawings.
Installation
Concealed aluminium rail with perimeter shadow gap; wall structure and fixings confirmed by site review Structural capacity and local compliance remain subject to review by the project team.
Shipping and field assembly
Vertical museum crate with edge protection and humidity buffer; insured freight and installation quoted separately. Freight is quoted after crate size, weight, destination, insurance and access are confirmed.
Service and replacement parts
Numbered modules and reversible connections are planned so drives, controls, lighting and optical components can be inspected or replaced individually. The final handover includes an operating guide and maintenance plan.



Fault Line No. 01 · technical outline
Standard commission envelope shown. Final dimensions, loads, fixings, power, service clearances, module breaks and crate sizes are issued after site review.


